{ title: 'The Farmingdale observer. (Farmingdale, N.Y.) 1963-current, April 21, 1977, Page 11, Image 11', download_links: [ { link: 'http://www.loc.gov/rss/ndnp/ndnp.xml', label: 'application/rss+xml', meta: 'News about NYS Historic Newspapers - RSS Feed', }, { link: '/lccn/sn95071030/1977-04-21/ed-1/seq-11/png/', label: 'image/png', meta: '', }, { link: '/lccn/sn95071030/1977-04-21/ed-1/seq-11.pdf', label: 'application/pdf', meta: '', }, { link: '/lccn/sn95071030/1977-04-21/ed-1/seq-11/ocr.xml', label: 'application/xml', meta: '', }, { link: '/lccn/sn95071030/1977-04-21/ed-1/seq-11/ocr.txt', label: 'text/plain', meta: '', }, ] }
Image provided by: Long Island Library Resources Council
Who Will Be Master & Miss Hardscrabble ? Brian Scutero Village Election [Continued from page 1] fdr the renovation work on the Village Hall. Frendolph's bid was the lowest received at $117,400. C.F. Mentzinger was awarded the plumbing contract for $14,470. Joseph Scutero VUo Scutero Tara Flood David Nalbach Delcon Electric was awarded the electrical contract for $11,900 and Spartan Mechanical Corp. received the contract for heating, ventilating and air conditioning for $31,680. Renovation and reconstruction work of the Village Hall will RICK EYESTER SERVICE CENTER \Rick is back in Farmingdale\ ALL AROUND AUTO REPAIRS ISO Fulton St. (Tomray Tire Co. Bldg.) MY4-2030 near corner 109 & Main St. w FARMINGDALE TREE SERVICE Expert Pruning, Toppings Take-downs, stump removal, Clean-ups and Cavities filled CALL US TODAY AT: FREE 420-1547 ESTIMATES LICENSED and INSURED begin within a week. Exterior work on the building will include a 12 foot wide extension on the village green side of the building, extending back to square the building off with the rear of the present firehouse building. The old jail structure will be demolished. The interior will include remodeled office area, a board meeting room, public toilet facilities designed lor the han- dicapped and aged, and a new larger public meeting room. Storm Drains Several storm drainage projects will be started shortly within the Farmingdale Village limits. The Nassau County Health Department requires that the village water supply be chlorinated during construction, which is estimated to take three months. Complaints [Continued from page 11 by Heisser Lane, Kent Street, Woodward Parkway, loth Avenue and Crestwood Blvd. \Every effort will be made to keep inconvenience to a minimum,\ Plock said. \But if anyone encounters a problem, Stibritz will do his best to resolve it in every way consistent with reasonableness and job progress.\ Plock assured residents that all pavements would be restored with surfaces of comparable quality to those presently existing following an interim period of temporary pavements. The temporary pavements are necessary to allow compaction and stabilization of back-filling material. 1042 FULTON ST. (Rt 109) FARMINGDALE 24 HR. TOWING 249-0926 EXPERT: Pai Chassis Straightening A CLEAN SHOP MAKES •Clean Work •Clean Offices • Clean Waiting Area ^H^HH,'...